Technical Guidance Document (DAMP Exhibit 7.III) in its entirety (one document)
By section:
Table of Contents, Acronyms, Glossary
Section 1. Introduction
Section 2. Technical Guidance for Preparing Project WQMPs
Section 3. Site Design Principles and Techniques
Section 4. LID and Treatment Control BMP Design
Section 5. Hydromodification Control Design
Section 6. Source Control Measures
Section 7. Operation and Maintenance Planning
Appendices:
Appendices Table of Contents
Appendix I. Summary of BMP Sizing Requirements for North Orange County
Appendix II. Summary of BMP Sizing Requirements for South Orange County
Appendix III. Hydrologic Calculations and Sizing Methods for LID and Treatment Control BMPs
Appendix IV. Approved Methodology for Quantifying Hydrologic Conditions of Concern (North Orange County)
Appendix V. Approved Methodology for Quantifying Hydrologic Conditions of Concern (South Orange County)
Appendix VI. Approved Methods for Calculation Alternative Compliance Obligation
Appendix VII. Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations
Appendix IX. Technical Basis for Green Rood Design Criteria
Appendix X. Harvest and Use Demand Calculations and Feasibility Screening
Appendix XI. Criteria for Designing BMPs to Achieve Maximum Feasible Retention and Biotreatment
Appendix XII. Biotreatment Selection, Design and Maintenance Criteria
Appendix XIII. Technical Basis for Incremental Threshold Benefits Criterion
Appendix XIV. BMP Fact Sheets
Individual BMP Fact Sheets
Appendix XV. Worksheets
Individual Worksheets
Appendix XVI. Watershed Exhibits
Individual Watershed Exhibits